Volunteer Tasks April and May
Please consider donating half a day to get a task or two done. We have lots of tasks, some require brawn, some require brains. Some tasks are high skill others are as easy as moving boxes.
We have broken down some of the jobs that need to be done into tasks that can be achieved in a few hours. Here's the list organized by room. The "Talk to" column shows who to talk to for more information about how to do the job. The "order" column is kind-of a priority system with 1 meaning "do this first" and then 2, 3, 4 are subsequent task.
Thank you
Digital Fabrication Room
Description of job |
Talk to |
Order |
|
Andrew |
1 |
|
Andrew |
2 |
Setup up dell laptop for 3d scanner |
Andrew |
3 |
|
Andrew |
2 |
|
Andrew |
2 |
|
Metal Machine Room (Rm12)
Description of job |
Talk to |
Order |
|
Jim |
1 |
General Drywall repair |
Meghan |
4 |
Paint |
Harry |
5 |
|
Steve |
1 |
Remove cork board northwest side. |
Jim |
1 |
|
Jim |
1 |
|
David |
1 |
|
David/Jim |
2 |
Repair studding to close in wall. |
David |
3 |
|
Meghan |
4 |
Paint wall sections. |
Harry |
5 |
Network wire for computer. |
Andrew |
6 |
Move benches in. Set up benches with vises, etc. |
Jim |
5 |
|
Steve |
5 |
Set up computer station. |
Andrew |
5 |
Metal welding Room (Rm 16) - Room available May 6th
Description of job |
Talk To |
Order |
|
Jim |
1 |
General Drywall repair |
Meghan |
5 |
|
Steve |
6 |
Paint |
Harry |
5 |
Remove all cork boards. |
Jim |
1 |
|
Jim |
3 |
|
David |
3 |
|
David |
3 |
|
Steve/David/Jim |
2 |
|
Steve |
3 |
|
David |
3 |
Take down the ceiling, hang lights clean up joist area. |
Steve/Ted |
4 |
Wood Rooms (11, 13, 15)
Description of job |
Contact |
Order |
|
David/Jim |
1 |
|
Joe |
2 |
Set up cabinet bench for small compound mitre saw (room 11) |
David/Jim |
3 |
Make downdraft tables and connect dust collection piping. |
David/Jim |
2 |
Make cleats for hand and power tools. |
Jim |
2 |
Air compressor – install anti vibration pads – install new flex hose – dampen drive belt safety cage. |
David |
1 |
Mount big cabinets to walls (room 11 and 15) |
Jim |
1 |
Make cleats for lathe tools (room 13) |
|
3 |
|
Steve/David |
1 |
I |
David/Jim |
2 |
Reinstall ceiling tiles in all rooms |
Jim |
3 |
Finish drywall and paint wall from CNC installation (room 15) |
Meghan |
3 |
Set up initial wood storage on west side of room 15 |
Lindsey |
1 |
Mount track saw guides on wall (room 15) |
David/Jim |
1 |
|
|
|
Assembly room (Room 19)
Description of job |
Talk to |
Order |
|
Jim |
1 |
|
Jim |
1 |
|
Jim |
1 |
|
Jim |
1 |
|
Jim |
1 |
|
Jim |
1 |
Marketing Room (room 17)
Description of job |
Talk to |
Order |
|
Harry |
1 |
|
Andrew/Harry |
1 |